A representative from the Intermountain Rural Electric Association (IREA) was present at the citizen briefing that took place at 5:00 PM on 3/28/12.
The representative said that they have confirmed that 267 structures are without power. They estimate that they must rebuild 2-3 miles of electric line.
The priority for IREA is getting power back to those homes without power. IREA will update their website (http://www.intermountain-rea.com/) with any new information.